OSLC Change Management December 6, 2012
Previous Meeting
Meeting logistics
Included in Meeting agendas and minutes
Agenda
Next meeting:
Minutes
Brian raised an issue asking if there is any place to see the difference between 2.0 and 3.0 (draft) specs. We will talk about version compatibility directly in the spec and outline the differences in an appendix.
Steve raised the issue of what to do with 1.0 spec (deprecate?). The 3.0 spec will likely not reference the 1.0 spec. We also have an open item on the OSLC-Core-Version header. Is it still needed?
Brian suggested we link the range of new priority and severity fields in draft 3.0 spec to their definitions. Sam will add this.
Sam will take an action item to include state transition draft into 3.0 spec.
Steve is looking reorganizing the CM spec vocability to separately define properties with status (when introduced, stable, etc.).
We’ll have one more meeting this year, December 13. Sam will schedule meetings for 2013.
Attendees
Sam, Steve, Brian, Bryan
Category:Meetings