Direction to the OSLC UG for Communications regarding OSLC Connect (PENDING)

Proposal

Excerpt from original email:

… given the discussion on this thread (and in Bola’s reply), I do think the following makes sense:

  1. Provide John’s summary as guidance to the Communications UG.
  2. Request that they provide a written update, including plan, by the end of June
  3. If an interim written update can be made available by May 31, discuss it in the June 7 meeting.

Results

+1s: Rainer, Andreas

No response (yet): Bola, Dave, John, Mik

Approval of OSLC Performance Monitoring V2 (ACCEPTED)

ACCEPTED, 15 May 2013

Proposal

Excerpt from original email:

I’m requesting on behalf of the Performance Monitoring Working Group an approval of the OSLC Performance Monitoring V2 specification and a subset of Estimation and Measurement (ESM) V2 specification to transition to final by email. Note: Since PerfMon needed almost exactly the same vocabulary terms drafted in ESM, they worked with ESM and Core WGs to finalize the needed subset.

The Core WG is satisfied with this specification, an Implementation Report is available, and a Test Suite is in place.

Results

+1s: Rainer, Andreas, Dave, Mik, John, Bola

Proposal to target the OASIS press release for May 30 (ACCEPTED)

ACCEPTED, 13 May 2013

Proposal

Excerpt from the original email from Sean Kennedy:

… the publicity plan I shared with you yesterday. One area for improvement we’ve identified is to do the press release on May 30 so that it can be referenced in press activities at Innovate. This will have an amplifying effect on the announcement. Doing the release after the news has been spoken about all week at Innovate may make it a little bit of a denouement and cause it to be ignored as “old news”.

Update on contingency plan if quotes don’t arrive on time from Carol Geyer of OASIS:

All founding companies will be featured in the subhead of the press release. All the quotes received by the deadline will be included in the body of the press release. The release will be distributed via BusinessWire on 30 May and posted on the OASIS web site. Any quotes we receive after the deadline can be added to the version on the OASIS web site.

OASIS standard practice is to give members 10 working days to provide quotes for press releases. If we schedule the release for 30 May, and set a quote deadline of 28 May, and we announce the deadline by tomorrow (14 May), people will have 11 days (although one of those days is a US holiday), so there is ample time. (We will still be able to accommodate last-minute quote submissions on 29 May.)

Results

+1s: Rainer, Bola, Mik, John, Andreas

While not as clear as a “+1”, these two emails, taken together, can be taken to mean that Dave also supports: A, 21.

Proposal to create an OSLC User Group for Mobile (ACCEPTED)

ACCEPTED, 24 April 2013

Proposal

Excerpt from the charter document (original email):

  • PURPOSE
    • To determine whether new Work Groups need to be formed and which existing Work Group specifications need to be updated to address mobile-specific needs
      • Provide liaisons and example scenarios / use cases / user stories to said Work Groups
    • Understand where OSLC activity may/should interact with other specifications and governing bodies
  • FOUNDERS
    • IBM (Charles Rankin, Leigh Williamson)
    • PointSource (Stephanie Trunzo, John Cammarata, Andy Ivory)
    • ClearBlade (Eric Simone, Aaron Allsbrook)
  • (POTENTIALLY) RELATED OSLC SPECIFICATIONS
    • Automation
    • Quality Management
    • Asset Management

Results

+1s: Mik, Rainer, Dave, John

No response: Andreas, Bola

Approval of OSLC Reconciliation V2.0 (ACCEPTED)

ACCEPTED, 16 April 2013

Proposal

Excerpt from original email:

I’m requesting on behalf of the Reconciliation Working Group an approval of the OSLC Reconciliation V2 specification to transition to final by email. The Core WG is satisfied with this specification, an Implementation Report is available, and a Test Suite plan is in place.

Results

+1s: Rainer, Andreas, Mik, John, Bola

No response: Dave

Proposal to create an OSLC User Group for Embedded Systems (ACCEPTED)

ACCEPTED, 15 April 2013

Proposal

Excerpt from the charter document (original email):

  • PURPOSE
    • We adopt the broadest scope of Embedded Systems to cover all its application domains & development phases.
    • We recognise, however, the need to split this user group to more focused groups as needs and interests of other OSLC User Groups develop. The scope of this User Group will hence be narrowed down in the course of its initial meetings.
    • In particular, we will align this User Group with the other new ALM/PLM User Group being formed.
    • One of the first activities of the User Group would be to identify use cases and scenarios.
  • FOUNDERS
    • The Royal Institute of Technology - KTH (Prof. Martin Törngren)
    • Siemens Corporate Technology (Rainer Ersch)
    • Atego (Hedley Apperly)
    • Creative Intellect Consulting Ltd (Bola Rotibi)
  • (POTENTIALLY) RELATED OSLC SPECIFICATIONS
    • ALM-PLM Interoperability
    • Architecture Management
    • Automation
    • Change Management
    • Requirements Management

Results

+1s: Rainer, Andreas, Dave, Bola, Mik

No response: John

Approval of OSLC Automation V2.0 (ACCEPTED)

ACCEPTED, 22 January 2013

Proposal

Excerpt from original email:

I am writing to you requesting your approval to transition OSLC Automation 2.0 to final specification phase. The Automation WG has completed the needed requirements (see below), including Core WG review and approval.

Results

+1s: Rainer, Dave, Mik, Andreas, Bola, John

Proposal to approach vendors about OSLC (ACCEPTED)

ACCEPTED, 19 November 2012

Proposal

Excerpt from original email:

  • As already discussed in previous StC meetings, we propose to install a StC focal point for two vendors to begin with
  • The two vendors should be Microsoft (TFS team) and Siemens PL.
  • The StC members being the focal point for these organizations should first approach them informally, but with the clear mandate of the StC to figure out what a next engagement step could be (e.g. a more formal meeting with a StC delegation).
  • The proposal is also that John should be the focal point for Siemens PL and Rainer takes this role for Microsoft.
  • Based on these experiences, we should later decide how useful this approach is and how to continue

Results

+1 : Dave Ingram, Andreas Keis, Rainer Ersch, Mik Kersten, Bola Rotibi,

No response: John Wiegand

Update

11 December 2012, John Wiegand also +1’ed.

Approval of OSLC Asset Management V2.0 (ACCEPTED)

ACCEPTED, 24 September 2012

Proposal

Excerpt from original email:

let us process the request to approve the OSLC Asset Management V2
specification by email instead of having it as an agenda item for the
September meeting

Results

+1: Rainer Ersch, Mik Kersten, John Wiegand, Andreas Keis

No response: Dave Ingram, Bola Rotibi


Category:Reference documents