This wiki is locked. Future workgroup activity and specification development must take place at our new wiki. For more information, see this blog post about the new governance model and this post about changes to the website.
-- GrayBachelor - 15 Aug 2011
DOORS 9.3 and RTC 3.0 integration

The detailed usage of the OSLC CM2.0 Specis documented here.

As of Aug 15th the Requirements Change aspects have been covered, which means that the Implementation Request aspects are not included here yet.

This is offered as an example of usage towards aspects of the main OSLC PLM scenario a Systems Engineer reacts to changes to requirements.

The file below includes the topcased sequence diagram.

References

Topic attachments
I Attachment Action Size Date Who Comment
zipzip DOORS_RTC_html_110811.zip manage 37.3 K 15 Aug 2011 - 09:01 GrayBachelor Clicakble html sequence diagram from topcased
jpgjpg RCR_V0.4_updated_12_8_11.jpg manage 165.6 K 15 Aug 2011 - 09:01 GrayBachelor jpg sequence
Topic revision: r2 - 03 Oct 2011 - 14:55:32 - SteveSpeicher
 
This site is powered by the TWiki collaboration platform Copyright � by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Contributions are governed by our Terms of Use
Ideas, requests, problems regarding this site? Send feedback