This wiki is locked. Future workgroup activity and specification development must take place at our new wiki. For more information, see this blog post about the new governance model and this post about changes to the website.

-- GrayBachelor - 23 Feb 2011

PLM Workgroup Process, Methods and Tools

Analysis and synthesis method in use

The workgroup identified a set of ALM-PLM interoperability concerns to garner workgoup member contributions by way of scenarios. The scenarios were analysed and represented as an OMG SysML? 1.2 Activity diagram in topcased, with anotation. A textual narrative decription was produced on the wiki with an overview powerpoint.

This scenario led to an identification of key business entities and their relationships documented by way of a PLM Reference model in SysML? with additional anotation consistent with ISO 10303 STEP AP233 again using topcased

Tools in use

topcased 3.4.1

http://www.topcased.org/

Additional links

Note that Mike Loeffler has posted some great links on the GM scenarios page here. We will transfer some of these here in due course.


This topic: Main > PlmHome > PlmBackground > PlmPMT
Topic revision: r1 - 23 Feb 2011 - 11:36:51 - GrayBachelor
 
This site is powered by the TWiki collaboration platform Copyright � by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Contributions are governed by our Terms of Use
Ideas, requests, problems regarding this site? Send feedback