This wiki is locked. Future workgroup activity and specification development must take place at our new wiki. For more information, see this blog post about the new governance model and this post about changes to the website.

ALM - PLM Scenarios

Scenarios selected for consideration and investigation

The OSLC ALM PLM scenarios are being built up from contributions from members, we invite submissions from interested parties within the Terms of Use of OSLC.

Selected Product Lifecycle Management and Systems Engineering Scenarios

The OSLC PLM workgroup members have selected the following scenarios:

  1. Systems Engineer Reacts to Changed Requirements (Accepted)
  2. Product change owner assigns a Change Request to a product context (Proposed)
  3. Product responsible creates a product (Work in progress)

OSLC PLM Reference Model

A detailed reference model to support the above scenarios has been built up, OSLC PLM Reference Model

Originating materials

Topic attachments
I AttachmentSorted ascending Action Size Date Who Comment
pptppt OSLC_PLM_Scenario_planning_V0.2.ppt manage 367.5 K 19 Jul 2011 - 14:48 GrayBachelor Workings at 19/7/11
Topic revision: r14 - 18 Jun 2012 - 13:47:13 - GrayBachelor
 
This site is powered by the TWiki collaboration platform Copyright � by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Contributions are governed by our Terms of Use
Ideas, requests, problems regarding this site? Send feedback